Following a formal tender submission, 4Runner Sport Surfaces were selected by Rochdale Borough Council to replace the existing sport hall floor at the Middleton Arena. Using their wealth of knowledge gained over many years of experience in replacing and refurbishing sport hall floors, 4Runner were able to assist the client with the product selection and methodology of the works. This included the removal of the old damaged metal sport floor and the installation of the Gerflor Taraflex Endurance System finished with Taraflex Sport M in Oak Design. The works were completed ahead of program despite the sport hall being on the 2nd floor with no accessible elevator!
Recent Comments